Engineering Factory Car Park

Bristol, UK

Engineering Factory external hard-standing for cars and delivery truck use, poured October 2012.

The area was approximately 120 m2 and filled with ready-mixed concrete (grade C25) from a Volumetric Mixer. 2 kg of Fibratec V12-AM Floor Fibres were used per m3.